Skip to content

The Money Path and the Auth Path

Run the Money Path and the Auth Path MicroSim Fullscreen

The Money Path and the Auth Path screenshot

About This MicroSim

A critical user path is a journey where a failure would hurt a user, lose money or expose private data. This MicroSim lays out two of them from the dating-safety app, step by step.

The money path runs from a member paying on Stripe's page to starting a paid scan. The auth path runs from a request arriving at a scan route to the server returning the scan to its owner.

Steps marked with a warning sign had no test in the running example. The wrong answer choices are illustrative.

How to Use

  1. Click any step in either path.
  2. Before the answer shows, pick what happens to a member if that step breaks.
  3. The panel tells you if you were right, shows the harm, and names the test that would catch it. The step turns green or pink.
  4. Answer all nine questions. Auth step 1 is the entry point and has no question.

Seven of nine right shows mastery. Notice which steps carry the warning sign: their failures show on no screen.

Iframe Embed Code

You can add this MicroSim to any web page by adding this to your HTML:

<iframe src="https://arunbatchu.github.io/good-enough-engineering/sims/critical-paths-map/main.html"
        height="549px"
        width="100%"
        scrolling="no"></iframe>

Lesson Plan

Grade Level

Adult professional (Good Enough Engineering)

Duration

10-15 minutes

Learning Objective

Explain, for each step of the money path and the auth path in the dating-safety app, what goes wrong for a member if that step breaks and which test would catch it.

Prerequisites

  • Critical user path
  • Webhook
  • Signature
  • Integration test
  • 401 and 404 status codes
  • Viewer role

Activities

  1. Exploration (3 min): Trace both paths left to right and read the legend.
  2. Guided Practice (6 min): Click each step and predict the harm before reading the answer.
  3. Assessment (4 min): Check your score. Explain why a viewer's change must be tested by a request sent straight to the server.

Assessment

Mastery is 7 of 9 steps predicted correctly on the first attempt. Opening a step again after answering is exploration.

References

  1. Stripe: Receive Stripe events in your webhook endpoint - signatures and retries.
  2. OWASP Top 10: Broken Access Control - why server-side checks matter.
  3. Mermaid flowchart syntax - the library that draws this diagram.