Circuit Breaker Step-Through¶
Run the Circuit Breaker Step-Through MicroSim Fullscreen
About This MicroSim¶
A circuit breaker stops calling a vendor for a while after it has failed several times in a row. It has three states.
- Closed: calls go through. Each failure adds 1 to the count; a success resets it to 0. At 5 failures in a row the breaker opens.
- Open: every call is skipped and returns not checked at once, until 30 seconds have passed.
- Half-open: the next call goes through as a trial. Success closes the breaker. Failure opens it again for another 30 seconds.
This MicroSim steps through a synthetic outage. The vendor is down from 0:00 to 1:10 and healthy after that. Nine calls arrive. At six checkpoints the sim stops and asks you to predict what happens next.
How to Use¶
- Press Step to move to the next event.
- At a checkpoint, pick the breaker state after the event. If a call arrives, also pick its result.
- Press Check prediction to see the answer and the rule that applied.
- Watch the tally of calls that waited out a timeout and calls answered at once.
- Hover over the states, the status rows and the event log to read more.
- Press Start over to try again.
Iframe Embed Code¶
You can add this MicroSim to any web page by adding this to your HTML:
<iframe src="https://arunbatchu.github.io/good-enough-engineering/sims/circuit-breaker-step-through/main.html"
height="586px"
width="100%"
scrolling="no"></iframe>
Lesson Plan¶
Learning Objective¶
Use the three-state circuit breaker rules to predict the breaker's state and each scan's photo-check result across a sequence of calls during a vendor outage and recovery.
Grade Level¶
Adult professional (Good Enough Engineering)
Duration¶
10-15 minutes
Prerequisites¶
Vendor outage, circuit breaker and its closed, open and half-open states, and the not checked result.
Activities¶
- Predict (5 min): Before stepping, write down when you expect the breaker to open and close.
- Apply (5 min): Step through all nine events, predicting at each checkpoint.
- Discuss (5 min): Only 6 of the 9 calls waited out a timeout. What would members have seen without the breaker?
Assessment¶
Mastery is 5 or more of the 6 checkpoints predicted correctly on the first attempt.
References¶
- Chapter 9: Working With Outside Services - the section on circuit breakers.
- Michael T. Nygard, Release It! Design and Deploy Production-Ready Software, Pragmatic Bookshelf, 2007.
- CircuitBreaker - Martin Fowler, 2014.
- p5.js reference - p5.js documentation.